A stunning resort complex located near the new Pirin Golf & Country Club in Bansko offering guaranteed rentals, fully furnished apartments and an attractive payment plan.
This resort will made of of 135 luxury apartments
consisting of studios, 1 & 2 bedroom apartments and penthouse
duplex apartments. All apartments have stunning mountain views and are
delivered turn-key with fully fitted kitchens and bathrooms, along with
a full furniture package included in the price.
An attractive payment plan means only 40% is required to secure an apartment with no further payments until hand over.
Guaranteed rent.
Should
the owner opt for this option they are guaranteed by contract (from
preliminary contract stage) a rental income of 5% NET per year for a
period of 2 years.
Week by week service.
This option is available
for those who require the most flexibility with their apartment, or
those that require a heavy personal usage.
Furniture
All
apartments on this complex come fully furnished. The furniture includes
everything including linen and accessories. The furniture is provided
according to the specifications set by the tour operators.
Maintenance:
• Maintenance Services are provided for EUR 10 per sq. m. annually.
Facilities:
• Hotel reception
• Lobby-bar with welcoming fireplace
• Shops and boutiques in lobby
• Casino
• Property management office and staff on-site
• Business conference centre – Exchange
• Doctor / Dentist
• Children play room
• Indoor swimming pool
• Children’s paddle pool
• Spa facilities
• Sauna
• Steam room
• Massage rooms
• Jacuzzi
• Fitness
Interieur apartments :
ENTRANCE HALL:
• Flooring - terra –cotta.
• Walls and ceilings - plaster coating and latex.
BEDROOMS:
• Flooring - parquet first quality
• Walls and ceilings - plaster coating and latex
BATHROOM AND TOILETS:
• Terra cotta and faience 2m above the floor and dispersed white
coating above the faience; bathrooms and the toilets - according the
architectural plan.
LIVING ROOM:
• Flooring – laminated parquet first quality
• Walls and ceilings - plaster coating and latex
KITCHEN:
• Flooring – terra-cotta Upper and lower cupboards, sink and taps
Construction Schedule:
Construction Start: May-Aug 2007
Basement: Oct 2007
Roofing: Aug 2008
Completion: Sept 2009
|